Motorists along the Waidra bridge on the Baulevu road in Nausori are advised that the bridge will be closed for maintenance work.

The Fiji Roads Authority will be clossing the bridge from 8:00pm Thursday 22nd November, to 6.00am Friday 23rd November

During this time, access will be prohibited across the bridge and there will be no detours posted.

The FRA will further continue works to remove and replace the damaged nailing strip, transverse planks and damaged running boards.

Bridge closure signs have been posted in advance of the closure period and motorists are requested to plan their travel accordingly.

The FRA will have standby vehicles available on both sides of the bridge, to cater for emergency events. The FRA wishes to complete these urgent repairs as quickly and safely as possible.

FRA apologises for the expected inconvenience.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Fiji TV Subscribe

Don't miss the HSBC Sevens Series LIVE on Fiji One.